Design and construction of firefighting shafts

Department for Communities and Local Government, (2019) Design and construction of firefighting shafts. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 15: Access to buildings for firefighting personnel – flats, 1 (15.11). RIBA Publishing Publication, London, p. 105. ISBN 9781859469156

Full text not available from this repository.

Abstract

A firefighting lift installation includes all of the following.
a. Lift car.
b. Lift well.
c. Lift machinery space.
d. Lift control system.
e. Lift communications system.
The lift shaft should be constructed in accordance with Section 6 of BS 9999.
Firefighting lift installations should conform to BS EN 81-72 and BS EN 81-20.

Item Type: Book Section
Additional Information: mml-maui-text-analytics-keywords
Uncontrolled Keywords: firefighting lift, firefighting lift, evacuation lift, liftway, firefighting shaft, firefighting lobby, step-free, common space, firefighting stair, commissioning
Subjects: T Technology > TH Building construction > Building standards > fire safety - volume 1: dwellings. 2019 edition - for use in england > Section 15: Access to buildings for firefighting personnel – flats
K Law > The Building Regulations 2010 > B5: Access and facilities for the fire service
T Technology > TH Building construction > Building standards
Date Deposited: 28 Feb 2020 21:02
Last Modified: 13 Oct 2021 19:41
URI: https://eprints.buildvoc.co.uk/id/eprint/821

Actions (login required)

View Item
View Item