Compartmentation Provision of compartmentation

Department for Communities and Local Government, (2019) Compartmentation Provision of compartmentation. In: Approved Document B: Fire Safety - Volume 1: Dwellings. 2019 ed. Section 5: Internal fire spread – dwellinghouses, 1 (5.5). RIBA Publishing Publication, London, p. 51. ISBN 9781859469156

Full text not available from this repository.

Abstract

Dwellinghouses that are semi-detached or in terraces should be considered as separate buildings. Every wall separating the dwellinghouses should be constructed as a compartment wall (see paragraphs 5.8 to 5.12).

Item Type: Book Section
Additional Information: mml-maui-text-analytics-keywords
Uncontrolled Keywords: dwellinghouse, separating wall, dwelling, dwelling, separated part, compartment wall or floor, compartment wall or floor, internal wall, compartment wall, separating wall
Subjects: T Technology > TH Building construction > Building standards > fire safety - volume 1: dwellings. 2019 edition - for use in england > Section 5: Internal fire spread – dwellinghouses
K Law > The Building Regulations 2010 > B3: Internal fire spread (structure)
T Technology > TH Building construction > Building standards
Date Deposited: 15 Feb 2020 06:05
Last Modified: 13 Oct 2021 19:41
URI: https://eprints.buildvoc.co.uk/id/eprint/458

Actions (login required)

View Item
View Item